New Westminster Pier Park
Pier Park is a linear riverfront park in New Westminster connecting what was once industrial lands to the downtown core.
GLE worked as a subcontractor at this park, installing several key components within the site: 270 lineal metres deltalok wall along the railroad ROW and 195 lineal metres MSE wall along the Fraser River, both at an average high over 2.5 meters tall; installation of three 450mm casings to bring services into the park under three sets of railroad track; sourcing and supplying over 190 boulders up to 3.0m in size; installation of unique site furniture from poles to benches; a two wire decoder irrigation system for 50+ zones; and planting and subsequent maintenance throughout the park.